Fire & Water Damage Restoration In Waco, TX
BELFOR Waco COVID-19 Cleaning Services
BELFOR Waco provides emergency fire, water, mold and storm damage restoration and disaster recovery services to Central Texas. We also provide additional support to BELFOR Austin, Belton and Dallas offices.
BELFOR Waco has the equipment and professionals to provide fast and effective service for any type of disaster in Central Texas. Services include emergency board-up and site containment; smoke and soot removal; water extraction and dehumidification; mold removal and remediation; document freeze drying and recovery; environmental services such as asbestos, lead and hazardous materials removal; electronics restoration; air duct cleaning; contents restoration; machinery decontamination, repair and rebuild; semiconductor decontamination; general contracting and reconstruction; consulting services; and more.
In the Heart of Texas – birthplace of Dr. Pepper and home to Baylor University, Texas Rangers Hall of Fame and Museum, and the Texas Sports Hall of Fame, BELFOR Waco is well known for their property recovery services and their community involvement.
After the fertilizer plant explosion in West, BELFOR Waco responded immediately with emergency and restoration services. In addition to rebuilding homes and schools, the team set up a temporary office where they offered support to residents by giving away boxes and plywood, and cooking free meals every day for one month.
BELFOR Waco is a member of the Heart of Texas Apartment Association, Waco Chamber of Commerce, and the Texas Association of Healthcare Facility Management.
We are also proud to be a certified Institute of Inspection, Cleaning and Restoration (IICRC) firm.
BELFOR Waco Restores Waco Boom Manufacturing Facility
BELFOR Waco completed the commercial remediation and restoration of Waco Boom, a local 30-year benchmark manufacturer of and supplier of fiberglass booms for aerial devices. After faulty electrical wiring caused a two-alarm fire in the facility, BELFOR mobilized a team of professionals to clean, decontaminate, repair and/or replace the roof and heavy structural damage. Machinery inside the facility was cleaned and decontaminated.
Waco Boom was able to begin shipping product again within three days and resume partial production within two weeks. The facility was at full production in less than six weeks.
"I cannot express enough how sincerely grateful our teams are for your outstanding performance on this remediation and restoration project. We could not be where we are today without the BELFOR team and your commitment to 'doing what it takes'to get the job done. It has been a real pleasure working with BELFOR and the amazing people who make BELFOR such a great restoration partner," said General Manager Laura L. Simon, V&L Management Company.